Built by a Senior Estimator & PM — Not a Generic Tech Startup

Stop Missing Critical Risks
in Your Tender Review
Get a Full Report in 24 Hours

Upload your tender pack. Get a full breakdown — scope by trade, risks flagged, missing information identified, RFIs ready to send, and a clear go/no-go verdict. JCT, NEC and bespoke contracts. Reviewed by a senior estimator.

Scope breakdown by trade
Risks & missing info flagged
Ready-to-send RFIs
Go / No-Go verdict
First report free
24-hour turnaround
Expert-reviewed, not just AI
UK-first, JCT & NEC aware

Most Contractors Are Pricing Blind

Incomplete drawings
Conflicting specifications
Missing scope items
Unrealistic programmes
One missed item can wipe out your profit.
We Find What You Don't See

Manual tender review is
costing you jobs

Tender packs now run to hundreds of pages across drawings, specs, schedules, appendices and clarifications. One missed clause — in a JCT, NEC or bespoke contract — turns a competitive price into a loss-making contract.

01

Days of Manual Reading

A large tender swallows 2–3 working days just to get the basics right. That's time your estimators aren't pricing, qualifying or submitting stronger bids.

02

Scope Gaps Slip Through

Missed exclusions, silent assumptions and buried requirements are margin killers. The commercial damage appears after award — when it's too late.

03

Contradictions & Hidden Risks

Conflicting specs across drawings, schedules and appendices create disputes, rework and variation battles that erode your profit on every job.

04

Missed Deadlines & Requirements

Submission rules, accreditations, insurance thresholds and clarifications are scattered across the pack. Miss one and you're disqualified.

What Contractors Usually Miss

These are the items that don't make it into most bids — until they become costly disputes after award.

🏗️

Structural Steel

  • Delegated connection design responsibility
  • Fireproofing exclusions
  • Craneage and temporary bracing assumptions
  • Erection sequencing constraints
  • Misc metals omitted from scope

Electrical

  • Temporary power during construction
  • Existing system integration scope
  • Shutdown coordination requirements
  • Commissioning scope and witnesses
  • BMS interface responsibilities
🧱

Drylining & Partitions

  • Acoustic performance specification conflicts
  • Fire rated partition requirements missed
  • Backing and blocking not in scope
  • Shaft wall and service riser framing
  • Ironmongery and door hardware excluded
🔥

Mechanical & HVAC

  • Landlord/tenant demarcation not defined
  • Commissioning and balancing scope
  • Acoustic attenuation requirements
  • Connections to existing plant
  • O&M manuals and as-built drawings
📐

Concrete & Formwork

  • Temporary works design responsibility
  • Concrete mix specification conflicts
  • Post-tensioning excluded from scope
  • Testing and cube samples responsibility
  • Waterproof concrete spec not priced
📄

Addenda & Revision Tracking

  • Revised drawings not spotted before pricing
  • Superseded specifications still being priced
  • New scope added in late addenda missed
  • Conflicting information between revisions
  • Referenced documents not included in pack

TenderScope scans drawings, specs, schedules and addenda to flag the issues most commonly missed during bid review — before you submit your price.

From upload to intelligence
in 24 hours

A four-stage workflow combining AI speed with real-world construction judgment — built by someone who has actually reviewed and priced tenders.

01
Upload

Submit Your Tender Pack

Fill in the form and upload your documents. PDFs, drawings, specs, schedules, addenda — we handle every format construction tendering throws at you.

02
Extract

AI Reads Every Page

The system processes the full pack — extracting scope by trade, specifications, key dates, JCT/NEC/AIA contract conditions, submission requirements and every risk flag across all documents.

03
Expert Review

Verified by a Senior Estimator

A senior estimator with real UK and US construction experience reviews every finding — removing false positives, adding commercial context, and checking contract-specific risks for JCT, NEC and AIA forms.

04
Deliver

Receive Your Intelligence Report

A structured PDF report — risk register, missing information log, RFIs, cost intelligence, procurement strategy, estimator scope breakdown and a clear go/no-go verdict — ready within 24 hours.

19 sections. One decision-ready document.

Every Tender Intelligence Report covers the full commercial picture — from contract conditions and scope gaps through to RFIs, risk register and go/no-go verdict. Built for subcontractors, main contractors and estimators.

01

Project Overview

Client, location, contract form, programme dates

02

Scope by Trade

Every trade extracted and listed

03

Key Specifications

Fire ratings, acoustic, materials, standards

04

Contract Conditions

LADs, retention, payment terms, onerous clauses

05

Submission Checklist

Everything required to submit a compliant bid

06

Key Dates

Return deadline, RFI cut-off, start, completion

07

Risk Register

Rated HIGH / MED / LOW with mitigations

08

Missing Information

Gaps flagged as CRITICAL / IMPORTANT / MINOR

09

Suggested RFIs

Ready-to-send questions for the client

10

Trade Relevance

HIGH / MED / LOW for every subcontract trade

11

Cost Intelligence

Provisional sums, contingency, cost drivers, value engineering opportunities

12

Programme Analysis

Realism check, constraints, long-lead items

13

Procurement Strategy

Package priority list with timing guidance

14

Go / No-Go Verdict

Scored recommendation — BID / QUALIFY / NO BID

15

Estimator Scope Breakdown

Every item — included, excluded, or assumed — clearly stated

16

Qualifications & Exclusions

Ready-to-paste qualifications for your tender submission

17

Estimator Action Checklist

Prioritised task list — everything to do before you submit

18

Tender Strategy

Positioning advice, provisional sum guidance, and commercial approach

19

Addenda & Revision Tracking

Revised drawings flagged, superseded specs identified, addenda requirements captured before you submit

A

Document Index

Full log of every document analysed, with page references throughout

Simple pricing. No surprises.

Start free. Pay only when you're ready. Cancel anytime.

Start Here
Free
First report — no card needed
Get Free Report →
Pay As You Go
£50
per single report
Buy Report →
Or save more with a monthly plan
Starter
Save £51
£99
per month
3 reports / month — £33 each
  • Full 18-section report
  • Risk register + RFIs
  • AI + expert review
  • 24-hour turnaround
Get Started →
Scale
Save £1,750
£750
per month
50 reports / month — £15 each
  • Everything in Growth
  • Custom templates
  • Multi-user access
  • Dedicated support
Get Started →
Cancel anytime. No contracts. Reports refresh monthly — unused reports do not roll over.

Submit your first tender.
We'll analyse it for free.

Fill in your details and upload your documents. We'll deliver your Tender Intelligence Report within 24 hours — no commitment, no software to install.

Main Contractor
Groundworks & Civil
Structure
Envelope & Cladding
Internal Fit-out
Mechanical & Electrical
Specialist
No trades selected
Secure document upload included
After submitting this form we will email you a secure upload link within the hour so you can send your tender documents safely. PDF, Word, Excel, drawings and ZIP files all accepted.

No commitment. Report delivered within 24 hours.

What you actually get

A structured, professionally formatted Tender Intelligence Report — not a chatbot summary. Here's exactly what lands in your inbox within 24 hours.

Civic Centre Refurbishment — Lot 3
UCL Estates · JCT Minor Works · London WC1H · 247 pages
● Report Complete QUALIFY AND BID
⚠️ Risk Register — Top Risks
HIGHAsbestos survey not included — 1970s building, high exposure risk during demolition
HIGHUndefined MEP scope — contractor responsible for full coordination but no drawings issued
MED9–10 week programme is tight for occupied building with restricted working hours
MEDFire stopping specification references superseded document — clarification required
LOWProvisional sum for specialist joinery not defined — recommend allowance of £25–40k
📋 Scope Summary — Key Trades
ElectricalHIGH
Drylining / PartitionsHIGH
CeilingsMED
Mechanical / HVACMED
FlooringLOW
❓ Suggested RFIs
RFI-001Is an asbestos survey available prior to demolition works commencing?
RFI-002Please confirm MEP design responsibility and issue outstanding coordination drawings
RFI-003Confirm permitted working hours for noisy operations in occupied building
RFI-004Fire stopping spec references BS 476 — please confirm compliance with current BS EN 1366
💷 Cost Intelligence
Specialist joinery provisional sum£35,000 (doc)
Asbestos delay allowance£20,000 (rec.)
Key driver: MEP coordinationRISK
Value engineering opportunityIDENTIFIED
Recommended contingency8% (incomplete design)
19 sections · Full PDF delivered within 24 hours · Expert-reviewed
Get This For Your Tender →

Built for contractors,
not enterprise bid teams

Most tender software targets large organisations with long onboarding cycles. TenderScope is built for the estimator who needs clarity by tomorrow morning.

Other AI Tools
TenderScope
Pure AI, no human check
Expert-reviewed output
Priced for large teams
Affordable monthly tiers
Heavy onboarding
Upload and receive
Generic construction language
Built by estimators
No UK-first tender focus
UK-first, JCT / NEC aware
Software you manage
Done-for-you report
⚠️

Risk Register

Every risk rated HIGH / MEDIUM / LOW with commercial impact and mitigation — including contract risk, scope gaps, onerous clauses and missing information.

📋

Scope Summary by Trade

Structured scope breakdown by trade extracted across drawings, specifications, schedules and contract documents — so estimators know exactly what they're pricing.

RFI Generation

Ready-to-send RFIs covering unclear specifications, missing drawings, scope gaps and conflicting information — worded professionally for client submission.

💷

Cost Intelligence

Document-grounded provisional sums, recommended contingency, key cost drivers, and value engineering opportunities — no AI guesses.

Missing one item in a tender
can cost you £10,000+

TenderScope helps you catch scope gaps, contradictions and missing information before you submit — not after you've won a contract you can't deliver profitably.

5–10 hrs
Saved per tender review
Stop spending full days manually reading 300-page tender and bid packs. Your estimators get the intelligence they need in minutes, not days.
💰
£10k+
Average cost of a missed scope item
One buried clause, one silent assumption, one missing spec. That's the difference between profit and loss.
📈
More bids
Reviewed with the same team
When each review takes hours instead of days, your estimators can pursue more opportunities without burning out.
🎯
Sharper bids
With better commercial intelligence
Know exactly what to price, what to qualify, and what to flag — before you submit, not after you've won.

Common questions

PDF, Word (.docx), Excel (.xlsx), and ZIP archives containing mixed packs. If your package includes large drawing sets or unusual formats, mention it in the form and we'll confirm before you send anything.
Our target is 24 hours from receiving the complete tender pack. Priority 12-hour turnaround is available on the Professional plan. If you have a tight deadline, let us know in your submission.
Yes. Tender documents are handled securely over HTTPS and are not shared with any third parties. We retain documents only for the time required to produce your report, after which they are deleted. See our Privacy Policy for full details.
The AI generates a structured initial analysis. A senior estimator with real UK construction experience then reviews every finding — removing false positives, adding commercial context, and ensuring the output reflects how real contractors actually read and price tenders. You get a reviewed intelligence report, not a chatbot summary.
Yes — monthly plans can be cancelled at any time with no penalties. You retain access until the end of your current billing period. No long-term commitments, no setup fees.
TenderScope is a done-for-you service, not a tool you operate yourself. We handle document processing, apply construction-specific analysis logic built around real tender review experience, and have a human expert verify every output. You receive a structured professional report — not a raw AI response that needs validating.
We focus on UK construction — JCT (SBC, Minor Works, D&B, Measured Term), NEC4, and bespoke/amended forms. We flag non-standard contract amendments as commercial risks so you know exactly what you're signing up to.

Tender & Bid Intelligence Blog

Practical guides for estimators and contractors — how to review tender packs, avoid scope gaps, manage contract risk, and price with confidence.

📋
Tender Review

How to Review a Tender Pack: A Step-by-Step Guide for Contractors

A structured approach to reviewing tender documents — what to read first, what to flag, and how to avoid the scope gaps that cost contractors thousands.

Read article →12 min read
⚠️
Contract Risk

What Are LADs in Construction and How Do They Affect Your Bid?

Liquidated and Ascertained Damages are one of the most misunderstood contract clauses — and one of the most expensive to ignore when pricing a tender.

Read article →10 min read
📝
RFIs

How to Write an RFI for a Tender (With Examples)

The right RFIs asked before submission can protect your margin and clarify scope. Here's how to identify what to ask and how to word it professionally.

View All Articles →

New articles published weekly · UK & US construction

What's Coming to TenderScope

AI-powered tools currently in development to help contractors manage tendering, document control, procurement, and project workflows.

📋

AI RFI & Clarification Tracker

Generate, issue, and track RFIs directly from tender analysis and missing project information — linked to your live report.

In Development · UK
📁

Smart Document Control

Automatically extract, organise, and structure bid packages, drawings, specifications, and addenda into a clean, searchable register.

In Development · USA
📊

Tender Intelligence Dashboard

Centralised overview of project risks, missing information, tender readiness score, and key commercial insights across all active bids.

In Development · UK
🔗

Procurement Tracker

Track supplier quotes, procurement packages, lead times, bonding requirements, and order status in one contractor dashboard.

In Development · USA
🗂️

Intelligent Drawing Register

Detect drawing revisions, disciplines, issue status, and latest revisions automatically — flagging superseded drawings before you price.

Coming Soon
🏗️

Contractor Project Workspace

Manage project documents, communications, RFI logs, and workflows in a simplified contractor portal built around your tender reports.

Coming Soon

Interested in Early Access?

We're building the next generation of AI-powered contractor tools. Join the waitlist and get early access to new TenderScope features as they launch.

No spam. We'll only email you when a feature you're interested in is ready.
✓ You're on the list — we'll be in touch when early access opens.

Built by someone who got tired of missing things in 300-page tender packs

Founded by a Senior Estimator & PM with 20+ years pricing major construction projects across the UK and United States — JCT, NEC, AIA and bespoke contract forms

TenderScope started as a personal frustration. After two decades of reviewing complex tender and bid packages under time pressure — on both sides of the Atlantic — knowing that one missed clause or buried specification could cost tens of thousands, it became clear that contractors needed better tools, not just more time.

Most AI tools in construction are built by tech companies who've never priced a job. TenderScope is different. Every analysis step, every risk flag, every RFI suggestion is based on how a real estimator actually reads a tender or bid package — JCT, NEC, AIA or bespoke — because that's exactly how it was designed.

If you've ever submitted a tender or bid and found out later you missed something that should have been obvious — a buried clause, a scope gap, an onerous contract condition — this was built for you.

20+Years in construction
£50M+Tenders reviewed
UK & USJCT, NEC & AIA

Ready to stop guessing
and start bidding smarter?

Submit your first tender or bid package for free. No commitment, no software to install — just a clearer commercial picture before you price.